Sign In | Join Free | My portofva.com
China Juvi Marine Machinery Co.,LTD logo
Juvi Marine Machinery Co.,LTD
Juvi,the perfect solution at the perfect time.
Site Member

5 Years

Home > Marine Boat Accessory >

Heavy Loads HDG Cable Ladder 900mm Width With Slotted Side Pieces

Juvi Marine Machinery Co.,LTD
Contact Now

Heavy Loads HDG Cable Ladder 900mm Width With Slotted Side Pieces

  • 1
  • 2

Brand Name : JV

Model Number : JVL-105

Certification : UL,CE

Place of Origin : China

MOQ : 10pcs

Payment Terms : L/C, T/T, Western Union

Supply Ability : 100000pcs/Month

Delivery Time : 20-30 days

Packaging Details : Standard export package, pallet

Product name : Marine cable ladder system

Width (mm) : 75-900

Application : Ship, boat

Color : Silver

Material : Carbon steel

Thickness (mm) : 40*4

Special : HDG

Type : V, as request

Contact Now

Ship Cable Ladder With Slotted Side-Pieces The Ladder For Heavy Loads Marine Cable Ladder

Type PR
Art. no.
HDG
Art. no.
SS
Art. no.
Weight (kg/m)
HRZE-P-100 86793 86780 86819 3,0
HRZE-P-150 86794 86781 86820 3,2
HRZE-P-200 86795 86782 86821 3,4,
HRZE-P-250 86796 86783 86822 3,6
HRZE-P-300 86797 86784 86823 3,8
HRZE-P-350 86798 86785 86824 4,0
HRZE-P-400 86799 86786 86825 4,2
HRZE-P-450 86800 86787 86826 4,4
HRZE-P-500 86801 86788 86827 4,6
HRZE-P-600 86802 86789 86828 5,0
HRZE-P-650 86803 86790 86829 5,3
HRZE-P-750 86804 86791 86830 5,7
HRZE-P-900* 86805 86792 86831 6,3
*) 2 x 450 are recommended for 900 mm widths.

Hot-dip galvanizing, also known as hot-dip galvanizing, has been widely used as an effective way of metal corrosion protection on metal structure facilities in various industries. Hot-dip galvanizing is a process of immersing the rusted steel components in a zinc solution melted at a high temperature of about 800°C so that the surface of the steel components is coated with a zinc layer with a thickness of not less than 65μm for thin plates below 5mm and not less than 86μm for thick plates, thus playing the purpose of corrosion prevention.

JUVI bridge is formed at one time so that the quality of the product is guaranteed, and each process has gone through the company's strict quality inspection. The quality of the product comes from our daily production of a serious, rigorous work attitude in addition. There should also be a set of the standardized enterprise production process.

The installation of cable bridges is mainly along with the top plate. Installation along the wall, installation along the shaft, installation along the ground. Along with the cable trench and pipe support installation. The support (hanger) frame used for installation can be finished or self-made. The support (hanger) frame is mainly fixed by pre-buried iron welding, expansion bolt fixing, etc. Bridge installation should comply with the following provisions.

1. straight section of steel cable bridge length of more than 30m, aluminum or glass steel bridge length of more than 15m, with expansion joints; cable bridge across the building deformation joints set up compensation devices.

2. cable bridges should be set up in the following places hanger or bracket: 0.5m at both ends of the bridge joints; - 1.5 per spacing; turning points; vertical bridges at 1.5m intervals.

3. hanger and bracket installation to maintain vertical, neat, solid, no skew phenomenon.

4. the bridge connecting plate bolts are fixed tightly without omission, the nut is located on the outside of the bridge.

5. cable bridges should be laid underneath flammable and explosive gas pipes and heat pipes.

6. metal bridges and their brackets should be no less than two groundings or zeroing the entire length.

7. metal bridges between the ends of the connecting piece of not less than two with anti-loosening nuts or anti-loosening washers connecting fixed bolts, and connecting the two ends of the piece across not less than 2.5 mm2 copper-core grounding wire.

8. the installation of the bridge should meet the following requirements: the deviation of the bridge left and right is not more than 20mm; the deviation of the bridge level per meter should not be more than 2mm; the deviation of the bridge verticality should not be more than 3mm.

9. cable bridge laying flammable and explosive gas pipeline and thermal pipeline below, when the design does not require, and the net distance of the pipeline, in line with the provisions of Table 12.2.1-2.

Heavy Loads HDG Cable Ladder 900mm Width With Slotted Side Pieces


Product Tags:

Heavy Loads HDG Cable Ladder

      

Slotted Side Pieces HDG Cable Ladder

      

900mm Width HDG Cable Ladder

      
China Heavy Loads HDG Cable Ladder 900mm Width With Slotted Side Pieces wholesale

Heavy Loads HDG Cable Ladder 900mm Width With Slotted Side Pieces Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Juvi Marine Machinery Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)